Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests…
Design requirements that are unique to Class 1E control boards, panels, and racks are specified. Standards for qualification tests to verify that these design requirements have been satisfied are provided.…
This standard specifies the design requirements for new and/or modified Class 1E control boards, panels, and racks and establishes the methods to verify that these requirements have been satisfied. Methods…
The independence requirements of the circuits and equipment comprising or associated with Class 1E systems are described. Criteria for the independence that can be achieved by physical separation and electrical…
Tests for measuring the pulse-height, spurious-pulse, and pulse-timing characteristics of photomultipliers used in scintillation and Cerenkov counters are presented. Five different measurement techniques are described. They are rise-time measurements, fall-time…
Superseded. Methods and requirements for qualifying continuous duty Class 1E motors for use in nuclear power generating stations are provided. The methods are used for qualifying motors, extending the qualification,…
Requirements for installation, inspection, and testing of power, instrumentation, and control equipment and systems during the construction phase of a nuclear facility are set forth. These requirements also cover modifications…
Superseded by IEEE 344-2004. Recommended practices for establishing procedures that will yield data that verify that the Class 1E equipment can meet its performance requirements during and following one safe…
The basic principles that are needed to conduct a reliability analysis of safety systems are provided for designers and operators of nuclear power plant safety systems and the concerned regulatory…