This guide presents field methods for detection, measurement, and localization of partial discharge (PD) in energized switchgear (above 1000 Vac) and the interpretations thereof. The main focus of the guide is: Establishing a baseline for PD detection or measurement; Establishing trending based on PD measurements over time; Providing guidance on recording and reporting of PD measurements; Further actions recommended to the user of this guide based on the outcome of the PD measurements.
- Sponsor Committee
- PE/SWG - Switchgear
Learn More About PE/SWG - Switchgear - Status
- Active PAR
- PAR Approval
- 2025-02-13
Working Group Details
- Society
- IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society - Sponsor Committee
- PE/SWG - Switchgear
Learn More About PE/SWG - Switchgear - Working Group
-
Field PD - C37.303 Guide for Field Measurement of Partial Discharge within switchgear (above 1000 Vac)
- IEEE Program Manager
- Jennifer Santulli
Contact Jennifer Santulli - Working Group Chair
- Adrian Lopez
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards