NotesFAQContact Us
Collection
Advanced
Search Tips
Back to results
ERIC Number: ED067992
Record Type: RIE
Publication Date: 1969-Aug
Pages: 11
Abstractor: N/A
ISBN: N/A
ISSN: N/A
EISSN: N/A
Do-It-Yourself Critical Path Method.
Morris, Edward P., Jr.
This report describes the critical path method (CPM), a system for planning and scheduling work to get the best time-cost combination for any particular job. With the use of diagrams, the report describes how CPM works on a step-by-step basis. CPM uses a network to show which parts of a job must be done and how they would eventually fit together to complete the entire job. These parts of a job are called activities. At the beginning and end of each activity there is a numbered event. The major benefit of CPM is seeing all of the related things required to complete a job being put down on paper in the order in which they must be done. (Author/CS)
Publication Type: N/A
Education Level: N/A
Audience: N/A
Language: N/A
Sponsor: N/A
Authoring Institution: Georgia Univ., Athens. Center for Management Systems.
Grant or Contract Numbers: N/A