NotesFAQContact Us
Collection
Advanced
Search Tips
Back to results
ERIC Number: ED195829
Record Type: RIE
Publication Date: 1980-Nov
Pages: 108
Abstractor: N/A
ISBN: N/A
ISSN: N/A
EISSN: N/A
Available Date: N/A
Contract Bidding for Rehabilitation Facilities.
Gilbertson, Alan D.
This book for sheltered workshop administrators outlines and explains the essential elements of an accurate work bid. Part 1 discusses issues that need to be resolved prior to calculating costs for a potential job. Part 2 describes the factors necessary for determining accurate bids, including direct costs (job setup, direct labor, direct materials, freight, direct machinery, and equipment); indirect costs (indirect labor, indirect materials, supervision, administration, indirect equipment); overhead (general administration, building occupancy); profit; and rehabilitation costs. Part 3 is a completed example of a contract bid. The publication also provides a procedural format for establishing bids (including examples and sample forms), and defines the terms and concepts necessary for the development of an accurate bid. (KC)
Materials Development Center, Stout Vocational Rehabilitation Institute, University of Wisconsin--Stout, Menomonie, WI 54751 ($4.25).
Publication Type: Guides - Non-Classroom
Education Level: N/A
Audience: N/A
Language: English
Sponsor: National Inst. of Handicapped Research (ED), Washington, DC.
Authoring Institution: Wisconsin Univ.-Stout, Menomonie. Stout Vocational Rehabilitation Inst.
Grant or Contract Numbers: N/A
Author Affiliations: N/A