ERIC Number: ED195829
Record Type: RIE
Publication Date: 1980-Nov
Pages: 108
Abstractor: N/A
ISBN: N/A
ISSN: N/A
EISSN: N/A
Available Date: N/A
Contract Bidding for Rehabilitation Facilities.
Gilbertson, Alan D.
This book for sheltered workshop administrators outlines and explains the essential elements of an accurate work bid. Part 1 discusses issues that need to be resolved prior to calculating costs for a potential job. Part 2 describes the factors necessary for determining accurate bids, including direct costs (job setup, direct labor, direct materials, freight, direct machinery, and equipment); indirect costs (indirect labor, indirect materials, supervision, administration, indirect equipment); overhead (general administration, building occupancy); profit; and rehabilitation costs. Part 3 is a completed example of a contract bid. The publication also provides a procedural format for establishing bids (including examples and sample forms), and defines the terms and concepts necessary for the development of an accurate bid. (KC)
Descriptors: Administrator Guides, Bids, Contracts, Cost Estimates, Rehabilitation Centers, Sheltered Workshops, Vocational Rehabilitation
Materials Development Center, Stout Vocational Rehabilitation Institute, University of Wisconsin--Stout, Menomonie, WI 54751 ($4.25).
Publication Type: Guides - Non-Classroom
Education Level: N/A
Audience: N/A
Language: English
Sponsor: National Inst. of Handicapped Research (ED), Washington, DC.
Authoring Institution: Wisconsin Univ.-Stout, Menomonie. Stout Vocational Rehabilitation Inst.
Grant or Contract Numbers: N/A
Author Affiliations: N/A