NotesFAQContact Us
Collection
Advanced
Search Tips
Showing all 4 results Save | Export
Foreman, Phillip – American School & University, 2009
Education administrators involved in construction initiatives unanimously agree that when it comes to change orders, less is more. Change orders have a negative rippling effect of driving up building costs and producing expensive project delays that often interfere with school operations and schedules. Some change orders are initiated by schools…
Descriptors: School Construction, Costs, Best Practices, Evaluation
Sebesta, James – Facilities Manager, 2010
Nearly every institution is faced with the situation of having to reduce the cost of a construction project from time to time through a process generally referred to as "value engineering." Just the mention of those words, however, gives rise to all types of connotations, thoughts, and memories (usually negative) for those in the…
Descriptors: School Construction, Engineering, Costs, Climate Control
GREEN, ALAN D.; AND OTHERS – 1966
THE FINAL REPORT OF A THREE PART FEASIBILITY STUDY OF THE COMPONENT CONSTRUCTION SYSTEMS SAMPLED APPROPRIATE ASPECTS OF THE SCHOOL CONSTRUCTION CLIMATE IN NEW YORK STATE. IT SOUGHT TO DETERMINE THE APPROPRIATENESS OF THE SCHOOL CONSTRUCTION SYSTEM DEVELOPEMENT PROCESS TO SCHOOL CONSTRUCTION IN THE MID-HUDSON VALLEY AND TO EXPLORE POSSIBILITIES FOR…
Descriptors: Building Design, Building Systems, Construction Costs, Costs
First California Commission on School Construction Systems, Palo Alto. – 1963
A SET OF EDUCATIONAL SPECIFICATION DRAFTED BY THE FIRST CALIFORNIA COMMISSION ON SCHOOL CONSTRUCTION SYSTEMS GIVES INFORMATION ON BIDDING PROCEDURES, A DESCRIPTION OF THE CURRENT CONSTRUCTION PROGRAM, PROCEDURES FOR SUBMITTING A PROPOSAL, DATA AND CONDITIONS RELATED TO THE DEVELOPMENT PHASE OF THE PROJECT, COMPONENT CONTRACTS, AND GENERAL…
Descriptors: Bids, Building Design, Building Systems, Construction Costs