NotesFAQContact Us
Collection
Advanced
Search Tips
Back to results
ERIC Number: EJ862979
Record Type: Journal
Publication Date: 2009-Jul
Pages: 4
Abstractor: ERIC
ISBN: N/A
ISSN: ISSN-0003-0945
EISSN: N/A
Available Date: N/A
The Long Haul
Erickson, Paul W.
American School & University, v81 n12 p12-15 Jul 2009
Most educational institutions have faced the decision whether to demolish, abandon or sell a facility. This article discusses how institutions can decide whether to renovate or build new. The author suggests to develop a campus- or districtwide master plan. A long-range master plan includes assessments of deferred maintenance, educational adequacy, life-cycle comparisons, construction costs (short- and long-term), parity and equity, mandates and code compliance. The assessments take into account the institution's teaching mission and educational philosophy. Master planning helps to measure a building's useful life, identify needed improvements and map out its future as it relates to enrollment demographics and educational adequacy. The process for decision-making is more all-encompassing than setting a "percentage threshold" comparison to replacement cost.
Penton Media Inc. American School & University, P.O. Box 2100, Skokie, IL 60076-7800. Tel: 866-505-7173; Fax: 847-763-9682; e-mail: americanschooluniversity@pbinews.com; Web site: http://asumag.com
Publication Type: Journal Articles; Reports - Descriptive
Education Level: Elementary Secondary Education; Higher Education; Postsecondary Education
Audience: N/A
Language: English
Sponsor: N/A
Authoring Institution: N/A
Grant or Contract Numbers: N/A
Author Affiliations: N/A