NotesFAQContact Us
Collection
Advanced
Search Tips
Back to results
ERIC Number: EJ910316
Record Type: Journal
Publication Date: 2010
Pages: 6
Abstractor: ERIC
ISBN: N/A
ISSN: ISSN-0882-7249
EISSN: N/A
Rightsizing HVAC Systems to Reduce Capital Costs and Save Energy
Sebesta, James
Facilities Manager, v26 n4 p43-48 Jul-Aug 2010
Nearly every institution is faced with the situation of having to reduce the cost of a construction project from time to time through a process generally referred to as "value engineering." Just the mention of those words, however, gives rise to all types of connotations, thoughts, and memories (usually negative) for those in the facilities departments of most educational institutions. The University of Minnesota has taken a more proactive approach and has moved to rightsize its HVAC systems as part of a value engineering and cost containment process for some of its building projects. Before discussing the details of the exercise at the University of Minnesota, the author first examines how the university got to the situation of conservatively sizing HVAC systems.
APPA: Association of Higher Education Facilities Officers. 1643 Prince Street, Alexandria, VA 22314. Tel: 703-684-1446; Fax: 703-543-2772; e-mail: appa@appa.org; Web site: http://www.appa.org
Publication Type: Journal Articles; Reports - Descriptive
Education Level: Higher Education
Audience: N/A
Language: English
Sponsor: N/A
Authoring Institution: N/A
Identifiers - Location: Minnesota
Grant or Contract Numbers: N/A