NotesFAQContact Us
Collection
Advanced
Search Tips
Showing all 3 results Save | Export
Gammie, David R. – American School and University, 1976
The Fullerton Union High School District investigated and found that the construction management approach provides assistance to control and supervise an entire building program. (Author/MLF)
Descriptors: Bids, Construction Costs, Construction Management, Cost Effectiveness
First California Commission on School Construction Systems, Palo Alto. – 1963
A SET OF EDUCATIONAL SPECIFICATION DRAFTED BY THE FIRST CALIFORNIA COMMISSION ON SCHOOL CONSTRUCTION SYSTEMS GIVES INFORMATION ON BIDDING PROCEDURES, A DESCRIPTION OF THE CURRENT CONSTRUCTION PROGRAM, PROCEDURES FOR SUBMITTING A PROPOSAL, DATA AND CONDITIONS RELATED TO THE DEVELOPMENT PHASE OF THE PROJECT, COMPONENT CONTRACTS, AND GENERAL…
Descriptors: Bids, Building Design, Building Systems, Construction Costs
California State Legislature, Sacramento. Joint Legislative Audit Committee. – 1998
The California legislature's Joint Legislative Audit Committee has issued a report on the design-build versus the design-bid-build process and offers a hybrid approach combining the two systems as a way of achieving the greatest cost efficiency at the least risk on public agencies. The cost benefits of faster delivery of the design-build method…
Descriptors: Administration, Bids, Comparative Analysis, Cost Effectiveness