Abstract:
The type, production, commissioning, and periodic tests, and evaluations that shall be performed to confirm that the interconnection and interoperation functions of equip...Show MoreScope:This standard specifies the type, production, commissioning, and periodic tests and evaluations that shall be performed to confirm that the interconnection and interopera...Show More
Purpose:Distributed energy resources (DERs) shall meet the requirements specified in IEEE Std 1547. Standardized test and evaluation procedures are necessary to establish and ver...Show More
Metadata
Abstract:
The type, production, commissioning, and periodic tests, and evaluations that shall be performed to confirm that the interconnection and interoperation functions of equipment and systems interconnecting distributed energy resources with the electric power system conform to IEEE Std 1547 are specified in this standard.
Scope:
This standard specifies the type, production, commissioning, and periodic tests and evaluations that shall be performed to confirm that the interconnection and interoperation functions of equipment and systems interconnecting distributed energy resources (DERs) with the electric power system (EPS) conform to IEEE Std 1547, as revised, corrected, or amended.
Purpose:
Distributed energy resources (DERs) shall meet the requirements specified in IEEE Std 1547. Standardized test and evaluation procedures are necessary to establish and verify compliance with those requirements. These procedures shall provide repeatable results and flexibility to accommodate a variety of DER technologies and functions.
Date of Publication: 21 May 2020
Electronic ISBN:978-1-5044-6550-2
ICS Code: 27.100 - Power stations in general
Persistent Link: https://ieeexplore.ieee.org/servlet/opac?punumber=9097532