415-1976 - IEEE Guide for Planning of Pre-operational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations | IEEE Standard | IEEE Xplore

415-1976 - IEEE Guide for Planning of Pre-operational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations


Abstract:

This document provides guidance for preoperational testing of Class 1E Power systems for nuclear-power generating stations. The extent of the system shall be that covered...Show More
Scope:This document provides guidance for pre-operational testing of Class IE Power systems for nuclear-power generating stations. The extent of the system shall be that covere...Show More
Purpose:The purpose of this document is to provide direction for establishing an acceptable pre-operational testing program for Class IE power systems in nuclear-power generating...Show More

Abstract:

This document provides guidance for preoperational testing of Class 1E Power systems for nuclear-power generating stations. The extent of the system shall be that covered by IEEE Std 308-1974, "Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations." The power systems include both AC and DC supplies but do not include the equipment which utilizes the AC and DC power.
Scope:
This document provides guidance for pre-operational testing of Class IE Power systems for nuclear-power generating stations. The extent of the system shall be that covered by IEEE Std 308-1974, Standard Criteria for Class IE Power Systems for Nuclear Power Generating Stations. A system is illustrated by Fig 1. The power systems include both ac and dc supplies but do not include the equipment which utilizes the ac and dc power.
Purpose:
The purpose of this document is to provide direction for establishing an acceptable pre-operational testing program for Class IE power systems in nuclear-power generating stations. The pre-operational tests are performed after the appropriate construction tests have been completed. The purpose of the pre-operational tests is to verify that the functioning of Class IE power systems performs their required function as described in the Final Safety Analysis Report (FSAR) of the station.
Date of Publication: 09 December 1976
Electronic ISBN:978-1-5044-0334-4
Persistent Link: https://ieeexplore.ieee.org/servlet/opac?punumber=7415888